China Nuclear gold original monazite project

Project Name: 15000t / a Monazite Grinding and Beneficiation Project
Project Introduction: The annual processing capacity of Monazite Concentrate is 15000 tons, and the service life is 15 years, including: feeding and pulping system, grinding system, iron removal system, grinding and leaching slurry conveying system, electrical control system, etc. the mineral processing technology of the project is advanced and mature, the level of automation equipment is high, and the production is stable and reliable.

Last message:Ruashi project
Next message:Jinchuan Bismuth Metallurgy